Road closure at Station Road, Irchester between 24th December - 27th December

Road closure at Station Road, Irchester between 24th December - 27th December

Information received this morning with regards to road closure at Station Road, Irchester between 24th December - 27th DecemberHatton Traffic Management have applied for a closure on the above road on behalf of Network Rail. This is to allow for the safe demolition of buildings alongside the railway line which can only be carried out with occupancy of the line. On that basis it is proposed that the road will be closed 50m either side of the bridge from 9pm on the 24th December until 10am on the 27th December 2020.The closure and diversion can be viewed here https://one.network/?tm=119647285

Posted: Fri, 20 Nov 2020 10:16 by Admin

Tags: News